Site icon Fly FM

Land Public Transport Agency Reveals Complete Timeline Of The LRT Train Crash



At 8.21pm, the empty coach was en route from Gombak to the Subang Depot by Automated Train Operation (ATO). However, the train experienced a time-out and stopped while it was approaching the Kampung Baru LRT station.

The time-out was caused by the vehicle’s failure to operate by ATO as the Vehicle On-Board Controller (VOBC) reached a halt.

The operations control centre then identified the location of the TR40 train and instructed the hostler to manoeuvre the train manually from the…

Click here to read the full article.

Source:

Exit mobile version